Binghalib Engineering Completes LVAC and Service Switch Board Delivery for 33/11kV Electrical Substation Project
Binghalib Engineering Completes LVAC and Service Switch Board Delivery for 33/11kV Electrical Substation Project Binghalib Engineering has successfully completed the design, manufacturing, testing, and delivery of the Essential LVAC Board and 415V AC Non-Essential Service Switch Board for a 33/11kV Electrical Substation Project in the United Arab Emirates. The switchboards were engineered and manufactured to meet the project’s specified operational and performance requirements. As part of the quality assurance process, the panels successfully completed the Client Factory Acceptance Test (FAT) before being delivered to site for the next phase of the project. With delivery complete, the equipment is now prepared for Site Acceptance Testing (SAT) and commissioning, supporting the project’s electrical infrastructure and power distribution requirements. Project Scope Design and engineering of the Essential LVAC Board Manufacturing of the 415V AC Non-Essential Service Switch Board Factory Acceptance Testing (FAT) with the client Delivery of completed panels to the project site Prepared for Site Acceptance Testing (SAT) and commissioning Binghalib Engineering provides low-voltage (LV) switchgear, power distribution, and electrical control panel solutions for utility, industrial, commercial, and infrastructure projects across the region.






